Skip to main content
All CollectionsSiteMinder GDS
GDS by SiteMinder - How to run a Rate Production report
GDS by SiteMinder - How to run a Rate Production report
Updated over a month ago

The Rate Production report tracks gross, cancelled and net bookings and for all rates and includes customisable top rankings and extended stay statistics.

  • Log in to GDS by SiteMinder

  • Go to Reports > Reports > Rates > Rate Production

User-added image
  • You will then see the below screen.

  • Select the date range and click Generate Report at the top of the screen.

User-added image
  • A window will pop up with the report results.

  • Save results by downloading as Excel, preferably.

  • Click on the disk icon and select Excel from the drop down.

User-added image
  • The report will then download to your computer, click on the download once complete to open the report file in Excel format and save to your preferred location.

Did this answer your question?